![]() |
At
Metzler /
|
![]() |
Framing
– Our framing standards far exceed the marketplace.
We typically use
two to three times the lumber amount required to insure tight, plumb and
reinforced interior partition walls. We
use engineered trusses installed on sixteen inch centers with additional
loading factored in for terraces, roofs and special conditions.
Our wall systems are
constructed of premium grade studs with a full 3 1/2” insulated cavity at all
perimeter walls. Unique to our
homes is our three layered flooring system consisting of 3/4” Douglas Fir
plywood, 1/2” layer of homosote for sound deadening and another layer of 5/8”
premium plywood. At all tiled
areas, we either mud set or install durock cement board prior to installing the
finish material. We carefully
block between the studs for cabinetry installation, bath hardware, picture and
mirror hanging and support systems for recessed or flush mount televisions.
|
![]() |
Plumbing
– We view plumbing as one of the backbones of our homes.
As a commitment to quality we use no PVC for our domestic
waste lines. All waste
lines are cast iron “quite pipe” which eliminates noise transmissions.
In each home, all water supply lines are insulated to prevent
temperature loss and sweating.
We install only hi recovery, hi capacity Lochinvar hot water
tanks. We vary the size and
quantity depending on the specific needs of each family.
Independent water lines are run to all terraces and outdoor
areas for future irrigation requirements. To
insure maximum water volume, we provide dedicated 1” copper water supply lines
to the master bath. Water pressure is increased from the city provided 35 lbs
psi to 70lbs psi via a domestic booster pump. Backup
pump systems with alarms are provided for the sump, ejector and lower level
mechanical rooms. A conveniently
located water filter provides filtered water to the kitchen and ice makers.
|
![]() |
HVAC
– Our homes are zoned with at least one furnace per floor to allow for
efficient and complete climate control.
Hot water radiant floor heat is provided in the lower level, breezeway and
garage floors. In the master bath,
we provide radiant heat for the floors and the shower bench.
We provide a radiant based snowmelt system for the front entry
steps and sidewalk. Our
humidification installation incorporates the industry best Nortec Steam
Humidification System for each zone.
We use discreet temperature sensors that enable us to remotely
locate the thermostats. All
return air ductwork is insulated for sound control and features return
registers in each room. |
![]() |
Electric
– Our relationship with our electrical subcontractor, AM&L Electric, dates
back to our first project in 1991. AM&L
Electric is a family owned company with a superior depth of knowledge in the
unique market of high-end custom homes. Not
only do they install all of the electrical components in our homes, they also
work closely with our clients in meeting special electrical requirements.
Lutron brand screwless devices are standard throughout our
homes.
|
![]() |
Audio
/ Video
– Baumeister Electronic Architects has been our preferred vendor for all of our
low voltage wiring requirements since 1996.
Their specialty is providing custom electronic solutions with an emphasis on
simplicity and high quality componentry. The
systems they plan with our clients are designed to flawlessly integrate and
operate the audio, video, phone, data, security and media systems of our homes.
At each television and telephone outlet location, a 3/4” blind
stub is provided and run to the audio video closet to accommodate any future
needs. |
![]() |
Sprinkler
– As a standard feature, we provide a Simplex Grinnell Professional Sprinkler
System. This system is nearly invisible but ensures superior coverage in case
of a fire. Potential property loss
is substantially reduced which is reflected in reduced insurance premiums for
our homeowners. In case of an
emergency, the system is designed to immediately notify the fire department and
homeowner. |
![]() |
Insulation
– Our insulation practices are above and beyond any typical installation.
We begin with a 1 1/2” R-7.5 rigid foam insulation that is installed
around the exterior of the foundation wall and a 2” R-10 rigid foam insulation
that is installed under all concrete slabs.
In addition to insulating all exterior perimeter walls, we insulate all
interior partition walls between bedrooms, baths, laundry and mechanical rooms.
Ceilings between all floors are fully insulated, along with all domestic
copper water supply lines. |
![]() |
Wall
Systems
– Each of our interior walls are stick built using premium lumber to insure a
plumb and precise fit. We use a
drywall system that is state of the art.
Between all bedrooms, baths, laundry and mechanical rooms we install a 1/2”
layer of soundboard prior to installing the 5/8” thick drywall.
We isolate the ceilings from the truss framing members to
insure that sound and vibration is not transmitted from floor to floor.
This is accomplished with drop ceilings, R/C channel and 1/2”
soundboard. In our lower level
playrooms, garages and gyms we use a hospital grade abuse board drywall to
guard against wall damage. |
![]() |
Painting
– Our
painting work is provided by an in-house team of dedicated painters.
Our painting process utilizes a four-coat system that incorporates two
primer coats and two finish coats. We begin with solid, non-finger-jointed
pre-primed custom mouldings and add finish coats that leave our mouldings with
a smooth rich finish. Our custom
staining for doors, millwork and mouldings is handled off site. All of our
stained goods are finished in a climate controlled, dust free environment to
insure the finest finish. |